Turbos Installation - Runtech

Category: Paper Industry

Year: 2016 / 2017

Place: Europa&c Kraft Viana - Viana do Castelo

Country: Portugal

Demolition of concrete structures, removal of vacuum pumps, piping and existing equipment. Construction of new concrete elements, assembly of turbos and auxiliary equipment. Prefabrication and assembly of piping of turbos and ecodrops connections to existing vacuum and exhaust lines, prefabrication and assembly of washing water lines for turbos and ecodrops, cooling of hydraulic units and connection to pumps.